top of page

An Analysis Of Weapon System Cost Growth (1993) By Jeffrey A. Drezner, Jeanne M. Jarvaise, Ron Hess, Daniel M. Norton, Paul G. Hough

 

Cost growth (meaning the underrun or overrun of actual vs. estimated costs) is an enduring and prevalent problem in weapon system development. In tight budgetary times, the problem is intensified because a systematic bias in cost estimates can undermine the basis of resource allocation decisions. This exploratory analysis attempts to quantify the magnitude of cost growth in weapon system programs, and identify factors affecting cost growth. The study revealed that cost estimates are systematically biased toward underestimation, resulting in an average program cost growth of 20%.

 

  • Soft Cover
  • 84 Pages
  • In Fair to Good Condition

An Analysis Of Weapon System Cost Growth (1993) By J. A. Drezner

19,99AU$Pris
Antal
Endast 1 kvar i lager
    Inga omdömen änBerätta vad du tycker. Var den första som lämnar ett omdöme.
    Tally Ho Chap ©
    © Copyright

    Liknande produkter

    bottom of page